Care 4 Me - Beacon, NY - Poured In Place Rubber Surface & Sail Shade Installation

1. The Trassig team removing the existing mulch surfacing.
2. The Trassig team preparing the site for poured in place rubber suface installation.
3. The first site with completed poured in place surface.
5. The first site from another angle.
6. The first site from a third angle.
4. Second site poured in place surface installed.
8. Playground sail shade installation.
9. Poured in place rubber surfacing installed.
7. Third site poured in place rubber surfacing installed.
10. Third site surfacing installation from another angle.